First floor structure reinforcement is banging away (literally). Most of the new lally columns are in. They are now getting started screwing and gluing new LVL joists to the existing (weak) floor joists and beams. They are reattaching the newly reinforced joists to the carrying beams and sills using galvonized joist hangers.
Site Structures was on site today giving the front yard a make over. They planted 2 pear trees, spread loam, and rolled out some fresh sod. It is looking good! They will be back tomorrow to finish up and install the front steps.